Monday, March 5th |
09:00 - 09:05 | Welcome by Mr. Mariano Navas-Gutierrez (Director at CEDEX) |
| and Jesus Gomez-Gonzalez (IGN Deputy Director) |
09:05 - 09:10 | Local announcements |
09:10 - 09:25 | H. Schuh | Welcome address and Chair's Report |
|
Session 1: The Next-Generation IVS Network and VLBI2010 Technology Developments. Chairs: Bill Petrachenko (09:25-13:00), Hayo Hase (11:15-13:00), Bill Petrachenko (14:30-16:15) |
|
09:25 - 09:50 | H. Kutterer | Establishment of the GGOS and the Importance of the Next-Generation VLBI System for It (I) |
09:50 - 10:15 | J. Gomez-Gonzalez | RAEGE: the Spanish-Portuguese contribution to GGOS (I) |
10:15 - 10:30 | H. Hase | The Future VLBI2010 Network (C) |
10:30 - 10:45 | A. Niell | First broadband results with a VLBI2010 system (C) |
10:45 - 11:15 | Coffee break |
11:15 - 11:30 | J.A. Lopez Fernandez | The RAEGE VLBI2010 Radiotelescope (C) |
11:30 - 11:45 | Y. Fukuzaki | New Project for constructing VLBI2010 Antenna in Japan (C) |
11:45 - 12:00 | P.E. Opset | Outreach activities in the endeavor for financing an upgrade of the Geodetic Observatory in Ny-Alesund (C) |
12:00 - 12:15 | J. Sun | New observing strategies with twin telescopes for geodetic VLBI (C) |
12:15 - 12:30 | J. Leek | Prospects of IVS-Intensive Sessions with Twin-Telescopes (C) |
12:30 - 12:45 | B. Petrachenko | VLBI2010: Progress and Challenges (C) |
12:45 - 13:00 | C. Beaudoin | VLBI2010 and the Westford station - the path forward (C) |
13:00 - 14:30 | Lunch break |
14:30 - 14:45 | F. Tercero | S/X/Ka coaxial feed for the tri-band receiver for RAEGE antennas (C) |
14:45 - 15:00 | J.A. López-Pérez | A tri-band cryogenic receive for the RAEGE project antennas (C) |
15:00 - 15:15 | K. Takefuji | Study of RF direct sampling technique for geodetic VLBI (C) |
15:15 - 15:30 | G. Tuccari | DBBC3 - A full digital implementation of the VLBI2010 backend (C) |
15:30 - 15:45 | C. Ruszczyk | VLBI 2010 using the RDBE and Mark5C (C) |
15:45 - 16:00 | A. Whitney | Mark 6 Next-Generation VLBI Data System (C) |
16:00 - 16:15 | R. Cappallo | Correlation and Post-processing for VLBI2010 (C) |
16:15 - 16:45 | Coffee break |
|
Session 2: Correlators, Stations and Operations Centers. Chairs: David Hall (16:45-18:35), Rüdiger Haas (09:00-10:45), David Hall (11:15-12:15) |
|
16:45 - 17:10 | K. Kokado | Recent Activities of Tsukuba Correlator/Analysis Center (I) |
17:10 - 17:25 | A. Bertarini | Bonn Correlator Status Report. (C) |
17:25 - 17:40 | S. Bernhart | e-transfer at the Bonn correlator (C) |
17:40 - 18:05 | U. Schreiber | Improving VLBI Station Performance (I) |
18:05 - 18:20 | M. Ettl | e-RemoteCtrl: Concepts for VLBI station control as part of NEXPReS (C) |
18:20 - 18:35 | H. Takiguchi | Warkworth geodetic station as a potential GGOS core site in New Zealand (C) |
Tuesday, March 6th |
09:00 - 09:15 | S. Yi | Korea Geodetic VLBI station (C) |
09:15 - 09:30 | A. Santamaría-Gómez | Estimation of the invariant reference point: first steps at Yebes (C) |
09:30 - 09:45 | I. Ryuichi | MARBLE (Multiple Antenna Radio-interferometry for Baseline Length Evaluation): Development of a compact VLBI system for calibrating GNSS and electronic distance measurement devices (C) |
09:45 - 10:00 | J. Lovell | The AuScope VLBI Array (C) |
10:00 - 10:15 | F. Shu | Geodetic VLBI observations for the CMONOC project (C) |
10:15 - 10:30 | E. Skurikhina | EOP Determination using the Russian Domestic VLBI Network "Quasar" (C) |
10:30 - 10:45 | D. Boboltz | A New VLBI Intensive Series Using the Mauna Kea and Pie Town Stations of the VLBA (C) |
10:45 - 11:15 | Coffee break |
11:15 - 11:30 | C. García-Miró | VLBI Data Acquisition Terminal modernization at the Deep Space Network (C) |
11:30 - 11:45 | B. Mannel | Co-location of VLBI with other techniques in space: a simulation study (C) |
11:45 - 12:00 | I. Schmelds | Plans for geo-VLBI in parallel to astro-VLBI observations at the VIRAC, Latvia (C) |
12:00 - 12:15 | L. Liu | Simulation Analysis of Positioning for probes in Chinese CE-3 mission (C) |
|
Session 3: Advances in Software Development, Analysis Strategies and Data Structure. Chair: Sébastien Lambert (12:15-13:05, 14:30-16:30, 09:00-09:30) |
|
12:15 - 12:40 | J. Gipson | Report of IVS Working 4: Proposed VLBI Data Format (I) |
12:40 - 13:05 | D. Gambis | Combination of Astro-Geodetic Techniques at the Normal Equation Level (I) |
13:05 - 14:30 | Lunch break |
14:30 - 14:45 | S. Bachmann | IVS combination center at BKG: Recent Activities (C) |
14:45 - 15:00 | C. Herrera | Remote Control and Monitoring of VLBI Experiments by Smartphones (C) |
15:00 - 15:15 | A. Neidhardt | Ideas for a cooperative software development for future GGOS stations (C) |
15:15 - 15:30 | S. Bolotin | The First Release of nuSolve (C) |
15:30 - 15:45 | K. Le Bail | Improving VLBI Processing by using Homogeneous Data for Pressure and Temperature (C) |
15:45 - 16:00 | M. Madzak | Universal Time from VLBI Intensives with ray-traced delays (C) |
16:00 - 16:15 | A. Romero-Wolf | Effects of Clock Correlated Noise on the Analysis of Space Geodetic Data (C) |
16:15 - 16:30 | Y. Kwak | Baseline analysis of 24-hour GPS-VLBI Hybrid observation (C) |
16:30 - 18:30 | Poster session and refreshments |
Wednesday, March 7th |
09:00 - 09:15 | L. Plank | Processing SELENE Differential VLBI Data (C) |
09:15 - 09:30 | L. Chen | Multi-frequency Same Beam VLBI Method Based on General TT and C Signal |
|
Session 4: Results in Geodesy, Astrometry and Geophysics and Their Interpretation. Chairs: Zinovy Malkin (09:30-10:45), Thomas Artz (11:15-13:00), Johannes Böhm (09:00-11:25) |
|
09:30 - 09:45 | J. Bohm | Challenges and perspectives for celestial and terrestrial reference frame determination (C) |
09:45 - 10:00 | M. Seitz | Consistent computation of ITRF and ICRF from homogeneously processed observation data (C) |
10:00 - 10:15 | M. Blossfeld | The role of VLBI in the weekly inter-technique combination (C) |
10:15 - 10:30 | S. Shabala | Network and quasar structure effects on the VLBI reference frame (C) |
10:30 - 10:45 | G. Bourda | Towards an accurate alignment of the VLBI frame and the future Gaia optical frame: global VLBI imaging observations of a sample of candidate sources for this alignment (C) |
10:45 - 11:15 | Coffee break |
|
11:15 - 11:30 | C.S. Jacobs | The Celestial Reference Frame at X/Ka-band (8.4/32 GHz) (C) |
11:30 - 11:45 | W. Majid | Dual Frequency VLBI Monitoring of a Large Sample of Compact Extragalactic Sources at 8 and 32 GHz (C) |
11:45 - 12:00 | S. Horiuchi | 32 GHz Celestial Reference Frame Survey for Dec less than -45 deg (C) |
12:00 - 12:15 | B. Zhang | Radio Astrometry of Red Supergiant VY CMa (C) |
12:15 - 12:30 | X. Minghui | Direct estimation of the Solar acceleration using geodetic/astrometric VLBI observations (C) |
12:30 - 12:45 | L. Combrinck | A comparison of General Relativity Theory evaluations using VLBI and SLR; will GGOS improve these results? (C) |
12:45 - 13:00 | Z. Malkin | Celestial pole offset: from initial analysis to end user (C) |
13:00 - 14:30 | Lunch break and trip to Yebes |
21:00 | Conference dinner at Restaurant Samarkanda |
Thursday, March 8th |
09:00 - 09:15 | T. Nilsson | High frequency Earth rotation parameters estimated from the CONT campaigns (C) |
09:15 - 09:30 | M. Uunila | Influence of source constellations on UT1 derived from IVS INT1 sessions (C) |
09:30 - 09:45 | H. Spicakova | Solid Earth tide parameters from VLBI measurements and FCN analysis (C) |
09:45 - 10:10 | V. Dehant | Recent advances in applications of geodetic VLBI to geophysics (I) |
10:10 - 10:25 | G. Elgered | Assessing the quality of WVR data from Onsala during the CONT11 geodetic VLBI campaign (C) |
10:25 - 10:40 | H. Kierulf | Past and present-day ice mass variation on Svalbard revealed by superconducting gravimeter, GPS and VLBI measurements (C) |
10:40 - 11:10 | Coffee break |
|
11:10 - 11:25 | R. Haas | VLBI and GNSS frequency link stabilities during CONT campaigns (C) |
11:25 - 11:40 | B. Campbell | Real-time e-VLBI in the EVN and software correlation developments at JIVE (C) |
Session 5: VLBI Analysis and Results from the Recent Megaquakes in Japan and Chile. Chair: Ryuichi Ichikawa (11:40-13:00) |
11:40 - 12:05 | R. Gross | The Rotational and Gravitational Signature of Recent Great Earthquakes (I) |
12:05 - 12:30 | S. Kurihara | The impact of the 2011 off the Pacific coast of Tohoku Earthquake on Tsukuba 32-m VLBI station (I) |
12:30 - 12:45 | D. MacMillan | Effects of the 2011 Tohoku Earthquake on VLBI geodetic measurements (C) |
12:45 - 13:00 | N. Kareinen | Determination of Tsukuba VLBI station post-Tohoku earthquake coordinates using VieVS (C) |
13:00 - 13:10 | H. Schuh | Closing |
14:30 - 18:30 | A. Nothnagel | 13th IVS Analysis Workshop |
Friday, March 9th |
9:00 - 17:00 | | Meeting of the IVS Board, at Royal Observatory of Madrid. |